×
Menu
Index

2 stage MCF sign off

 
If enabled by an Admin user, a dual sign off process for moving a Method from Development to Routine can be used.
 
When selected by Admin, the Sign off described previously is stage 1. Typically this would be the laboratory manager signing to say that the Method is ready to use from a laboratory point of view.
 
The MCF is then transferred to the Audit room, and must be approved there before it becomes the Routine mode MCF.
 
 
This allows a Method to be locked down, but not implemented until manufacturing, etc. are ready.